• Tajik
  • Русский
  • English

The main aim of the construction of this road is to reduce the flow of vehicles passing through the transit route through Dushanbe, as well as providing transit passage and maintaining the existing conditions of the city road.

Total length: 12,6 km
Estimated cost: 84,6 million USD