The purpose of the construction of this bridge is to increase  freight traffic, and also this bridge will  give an opportunity to the population of the left bank of Muksu river to have qualified medical treatment in a district hospital located on the opposite bank of the Muksu River.                               Estimated cost: 3,6 million USD