• Tajik
  • Русский
  • English

INVITATION FOR PREQUALIFICATION

Project name

Dushanbe - Uzbekistan Border Road Improvement Project

Country

Tajikistan

Business sector

Transport

Project ID

42232

Funding source

EBRD, AIIB and RT

Type of contract

Works

Type of notice

Invitation for Prequalification

Issue date

01 December 2016

Closing date

18 January 2017

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This Invitation for Prequalification follows the General Procurement Notice for this project which was published on the EBRD website, Project Procurement Notices (http://www.ebrd.com/work-with-us/procurement/p-pn-160429a.html) on 29.04.2016.

The Ministry of Transport of the Republic of Tajikistan, hereinafter referred to as “the Client”, intends using part of the proceeds of a loan from the European Bank for Reconstruction and Development and Asian Infrastructure Investment Bank, hereinafter referred to as “the Bank”, towards the cost of “The Road Reconstruction from Avicenna round about to West gate, Section km 0 – km 1.2; km 1.94 – km 4.0; km 4.0 – km 4.9”.

The Client intends prequalifying firms and consortia to tender for the following contract, hereinafter referred to as “the Contract”, to be funded from part of the proceeds of the loan:

Contract  “Section from the Avicenna Monument to the West Gate, Dushanbe

KM 0 – KM 1.2; KM 1.94 – KM 4.0; KM 4.0 – KM 4.9»

The scope of work involves construction of following structures / Facilities

А. Section km 0 – km 1.2:

  • Construction of a three-level interchange at km 0.327.
  • Construction of a two-level interchange at the roundabout at intersection of N. Maksum Prospekt and Maykovskogo Street.
  • Construction of an overpass at km 0.827.
  • Construction of retaining wall at km 0.123 – km 0.267; km 0.388 – km 0.532 at A. Sino Prospekt 730 m.
  • Reconstruction of the pedestrian underpass at km 0.083.
  • Construction of pedestrian underpasses at km 0.585, km 0.103, at km 0.38.

B. Section km 1.9 – km 4.0

  • Construction of a two-level interchange at km 2.183.
  • Construction of one-level interchanges at km 3.013 – km 3.115.
  • Construction of pedestrian underpasses at km 3.1 83.
  • Construction of an overpass at km 2.150.
  • Construction of 600m-long retaining wall at Bagovuddinova Street; 

C. Section km 4.0 – km 4.9

  • Construction of one-level interchanges at intersection of N. Makhsuma on km 4.520 – km 4.6.
  •  Construction of one-level interchange on km 4.867 at West Gate Dushanbe.
  • Construction of reinforced concrete retaining walls on km 4.702 and on km 4.4 – km 4.776.

The estimated completion period is two years followed by one year of the defect notification period.

Prequalification and tendering for contracts to be financed with the proceeds of a loan from the Bank is open to firms and joint ventures of firms from any country.

Prequalification documents may be obtained from the office at the address below upon payment of a non-refundable fee of US $ 100 or equivalent in a convertible currency or by TT to following Bank account:

Project Implementation Unit Road Rehabilitation

SSB “AMONATBONK, Dushanbe, Tajikistan

TIN: 010013762

MFO: 350101626

Correspondent account: 20202972101741101000

USD Account: 30111840500000000037

         SWIFT code: ASSETJ22

Upon receipt of appropriate evidence of payment of the non-refundable fee, the documents will promptly be dispatched by courier; however, no liability can be accepted for their loss or late delivery.

If requested, the documents can be dispatched electronically in PDF format free of charge.

The prequalification documents must be duly completed and delivered to the address below, on or before 18 January 2017 at 10:00 a.m. (local time)Documents which are received late may be rejected and returned unopened.

State Committee for Investment and State Property Management

of the Republic of Tajikistan

Street Address:             27, Shotemur Street

Room number:             Room 9

City:                              Dushanbe

ZIP Code:                     734025

Interested firms may obtain further information from, and inspect and acquire the prequalification documents at the following office: 

Attention: Mr.  N. Arabzoda, Executive Director

Project Implementation Unit for Road Rehabilitation

Ministry of Transport of the Republic of Tajikistan

Street Address: 14 Ayni Street

Floor/Room number: 4 floor / No.407

City: Dushanbe

Postal Code: 734042

Country: Tajikistan

Telephone: +992 37 2222073

Facsimile number: +992 37 2222076

E-mail: piurr@tojikiston.com