|
Project name |
Dushanbe - Uzbekistan Border Road Improvement Project |
|
Country |
Tajikistan |
|
Business sector |
Transport |
|
Project ID |
42232 |
|
Funding source |
EBRD, AIIB and RT |
|
Type of contract |
Works |
|
Type of notice |
Invitation for Prequalification |
|
Issue date |
30 November 2016 |
|
Closing date |
18 January 2017 |
This Invitation for Prequalification follows the General Procurement Notice for this project which was published on the EBRD website, Project Procurement Notices, on 29 April 2016 (http://www.ebrd.com/work-with-us/procurement/p-pn-160429a.html).
The Ministry of Transport of the Republic of Tajikistan, hereinafter referred to as “the Client”, intends using part of the proceeds of a loan from the European Bank for Reconstruction and Development, hereinafter referred to as “the Bank”, and from the Asian Infrastructure Investment Bank towards the cost of Dushanbe – Uzbek border Road Improvement Project.
The Client intends prequalifying firms and consortia to tender for the following contract, hereinafter referred to as “the Contract”, to be funded from part of the proceeds of the loans:
Upgrade of M41 road section between the Avicenna Monument and the West Gate, km 0 – km 1.2, km 1.94 – km 4.0, km 4.0 – km 4.9
The scope of work involves amongst others construction of following structures / Facilities
Section km 0 – km 1.2:
- Construction of a three-level interchange at km 0.327.
- Construction of a two-level interchange at the roundabout at intersection of N. Maksum Prospekt and Maykovskogo Street.
- Construction of an overpass at km 0.827.
- Construction of retaining wall at km 0.123 – km 0.267; km 0.388 – km 0.532 at A. Sino Prospekt 730 m.
- Reconstruction of the pedestrian underpass at km 0.083.
- Construction of pedestrian underpasses at km 0.585, km 0.103, at km 0.38.
Section km 1.9 – km 4.0
- Construction of a two-level interchange at km 2.183.
- Construction of one-level interchanges at km 3.013 – km 3.115.
- Construction of pedestrian underpasses at km 3.1 83.
- Construction of an overpass at km 2.150.
- Construction of 600m-long retaining wall at Bagovuddinova Street;
Section km 4.0 – km 4.9
- Construction of one-level interchanges at intersection of N. Makhsuma on km 4.520 – km 4.6.
- Construction of one-level interchange on km 4.867 at West Gate Dushanbe.
- Construction of reinforced concrete retaining walls on km 4.702 and on km 4.4 – km 4.776.
The estimated completion period is two years followed by one year of the defect notification period.
Prequalification and tendering for contracts to be financed with the proceeds of a loan from the Bank is open to firms and joint ventures of firms from any country.
Prequalification documents may be obtained from the office at the address below upon payment of a non-refundable fee of US$ 100 or equivalent in a convertible currency or by TT to the following client’s account:
Project Implementation Unit Road Rehabilitation
State Savings Bank “AMONATBONK”, Dushanbe, Tajikistan
TIN: 010013762
MFO: 350101626
Correspondent account: 20202972101741101000
USD Account: 30111840500000000037
SWIFT code: ASSETJ22.
Corresponding Bank Details
International Bank: DEUTCHE BANK TRUST COMPANY AMERICAS
Bank address: NEW YORK NY US
SWIFT: BKTRUS33
Bank correspondent: OJSC BANK TRANSCAPITALBANK
Bank address: MOSCOW RU
SWIFT: TJSCRUMM
Account: 04433890
Beneficiary Bank: STATE SAVINGS BANK OF TAJIKISTAN
Bank address: “AMONATBONK”, Dushanbe, Tajikistan
Bank account: 30111840500000000037
SWIFT: ASSE1J22
Beneficiary: PIU RR (Construction of three level interchange)
Beneficiary account: 20206840001238101000
Upon receipt of appropriate evidence of payment of the non-refundable fee, the documents will promptly be dispatched by courier; however, no liability can be accepted for their loss or late delivery.
If requested, the documents can be dispatched electronically in PDF format free of charge.
The prequalification documents must be duly completed and delivered to the following address, on or before 10:00 a.m. (local Tajikistan time) 18 January 2017:
‘State Committee for Investment and State Property Management of the Republic of Tajikistan’
Street Address: 27, Shotemur Street
Room number: Room 9
City: Dushanbe
Postal Code: 734025
Documents which are received late may be rejected and returned unopened.
Interested firms may obtain further information from, and inspect and acquire the prequalification documents at the following office:
Mr. N. Arabzoda, Executive Director
Project Implementation Unit for Road Rehabilitation of
The Ministry of Transport of the Republic of Tajikistan
Address: 4 floor / room No.407, 14 Ayni Street, Dushanbe, Tajikistan
Postal Code: 734042
Telephone: +992 37 2222073
Facsimile number: +992 37 2222076
E-mail: piurr@bk.ru
