• Tajik
  • Русский
  • English

 

 July 17-18 duringthe series of mudslides on the Barsemdara river, the riverbed Gund on 638 km ofthe Dushanbe-Khorog-  Murgab-Kulma highway blocked and the river level has risenby 25-30 meters, which led to the flooding of living and  administrativebuildings in Berdibekov, Kalhazabad and Barsem settlements.

 Accordingto the latest data 3.5 km of international importance road, 12 km local roadsbetween the villages and 4 bridges (2  road and 2 pedestrian) completelydestroyed during this natural disaster.